รูปภาพนี้มี Alt แอตทริบิวต์เป็นค่าว่าง ชื่อไฟล์คือ icon_water1.png

Water Conservation Program Implementation

Maejo University has a 75,000-cubic meter raw water pond that supplies water for water supply Plant 1; a 20,000-cubic meter pond that provides water for water supply 2; a 32,200-cubic meter pond that supplies water for water supply Plant3; a 60,000-cubic meter pond that is used for agricultural purposes; as well as the Mae Faek-Mae Ngat Somboonshon Operation and Maintenance Project and natural canals running through the university. Currently, there are sufficient surface water sources for both the water supply system and agriculture.

Water source in Maejo University map

Water source of Maejo university

At present, Maejo University has a problem diverting water from the irrigation canal into the raw water storage pond of the second water supply plant, which has a relatively small storage capacity and insufficient to produce tap water to supply to water users for consumption. Therefore, there is a project to lay a pipeline to supply water from the raw water storage pond of first tap water plant, which has a larger capacity and storage volume, to the raw water pond of the second water plant. The budget of this project was $260,000. This project can support the water supply system of the second water supply plant to be sufficient for utility and agriculture by two water pumps, that have capacity 16.41 HP and flow rate was 6,667 LPM. Currently, the project is in progress.